Floss Pick
Spark Innovation’s mechanical designers worked closely with this client to develop and produce this high flow capacity flosser unit from the ground up. Validation, testing and onto a fully functional prototype ready for production.
Floss Pick
Spark Innovation’s mechanical designers worked closely with this client to develop and produce this high flow capacity flosser unit from the ground up. Validation, testing and onto a fully functional prototype ready for production.
Water tank lid
Water tank
Rear housing
Pick neck and water dispensing head
Power cord
Pick water supply line
Main internal chassis
Stabilizing suction feet
PCB and dial
Front housing
Pump mechanism
Gear system and chassis
Head Design
The waterpick uses water jets aimed at the front and back of your teeth. The jets clean 360 degrees around each tooth multiple times. With Instafloss, you get better results in 10 seconds than in two minutes with string flossing.
Pump Mechanism
The process of designing the internal mechanical components of the product required a reverse engineering tear-down of existing pumps and flossers. Our team re-designed the floss pump to work with the water volume and pressure requirements of the project.
Pump Mechanism
The process of designing the internal mechanical components of the product required a reverse engineering tear-down of existing pumps and flossers. Our team re-designed the floss pump to work with the water volume and pressure requirements of the project.
Prototype Development & Production
The client for this project required a fully functioning prototype for demonstration and validation. The prototype also needed to look finished for marketing assets like images and videos. Production intent design was also a main goal of this project to engage suppliers for RFQs.
Prototype Development & Production
The client for this project required a fully functioning prototype for demonstration and validation. The prototype also needed to look finished for marketing assets like images and videos. Production intent design was also a main goal of this project to engage suppliers for RFQs.